MODERNISATION OF STEAM TURBINE CONSTRUCTION AT REGENERATIVE STEAM EXTRACTION POINT
Abstract
The paper presents a methodology which has led to improvement of the turbine stage performance in the regenerative steam extraction chamber area by introducing a ring which collects the leakage flow from the gaps over unshrouded rotor blade tips and directs it to the extraction chamber. A comparison is made between the results obtained for the initial design (without a ring) and the design with the ring mounted. The results obtained for the construction were calibrated using the data measured on a real turbine in a Polish power plant.
Keywords:
modernization, turbine stage, extraction point, leakageDetails
- Issue
- Vol. 14 No. 4 (2010)
- Section
- Research article
- Published
- 2010-12-29
- Licencja:
-
This work is licensed under a Creative Commons Attribution 4.0 International License.